Gilead Sciences La Verne Rooftop Solar

Los Angeles County, California · EIA plant ID 65569 · Operator: gilead sciences, inc. - la verne
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh202220242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202617.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20211.723.9%—
2022321.6%—
20242.517.9%—
20252.517.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GSRBABatteriesBA1.11.1Jul 2021Operating—coming soon
GSRSPSolar PhotovoltaicPV1.71.6Jul 2021Operating—coming soon

Owner / operator

Operator: gilead sciences, inc. - la verne. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
gilead sciences, inc. - la verne100.0%3 MW

Nearby plants

Within 80 km.
Weymouth Solar Plant3 MW1.4 km
San Dimas10 MW3.7 km
San Dimas Wash Generating Station1 MW3.8 km
VESI Pomona40 MW4.2 km
Walnut Unified School District Walnut HS Hybrid2 MW10.4 km
Industry MetroLink PV 12 MW11.4 km