← Back to map

Weymouth Solar Plant

Los Angeles County, California · EIA plant ID 60255 · Operator: Metropolitan Water District of S CA
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators2in service
Net generation3GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202612.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20162.818.4%—
20176.123.2%—
20185.721.7%—
2019519.0%—
2020519.0%—
20215.320.1%—
2022622.7%—
2023518.9%—
20244.818.3%—
20253.312.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV22Jun 2016Operating—coming soon
2Solar PhotovoltaicPV11Jun 2016Operating—coming soon

Owner / operator

Operator: Metropolitan Water District of S CA. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Metropolitan Water District of S CA100.0%3 MW

Nearby plants

Within 80 km.
Gilead Sciences La Verne Rooftop Solar3 MW1.4 km
San Dimas10 MW2.4 km
San Dimas Wash Generating Station1 MW2.7 km
VESI Pomona40 MW5.5 km
Walnut Unified School District Walnut HS Hybrid2 MW11.5 km