← Back to map

San Dimas Wash Generating Station

Los Angeles County, California · EIA plant ID 50233 · Operator: San Gabriel Valley Mun Wtr Dt
HydroConventional HydroelectricCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor13%hydro units, summer MW
Heat rate—thermal plants only
First online1986

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh200120032006200820102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202513.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200100.0%—
20024.754.0%—
20033.742.7%—
20052.629.9%—
20060.89.1%—
200700.0%—
20080.77.4%—
200900.0%—
20103.236.9%—
20112.326.0%—
2012333.7%—
201300.0%—
201400.0%—
201500.0%—
20161.517.0%—
20170.44.3%—
20181.213.6%—
2019334.5%—
202000.0%—
202100.0%—
202200.0%—
20232.933.5%—
20242.427.6%—
20251.213.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
4011Conventional HydroelectricHY11Mar 1986Operating (Standby / backup)—coming soon

Owner / operator

Operator: San Gabriel Valley Mun Wtr Dt. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
San Gabriel Valley Mun Wtr Dt100.0%1 MW

Nearby plants

Within 80 km.
San Dimas10 MW0.9 km
Weymouth Solar Plant3 MW2.7 km
Gilead Sciences La Verne Rooftop Solar3 MW3.8 km
VESI Pomona40 MW7.7 km
San Gabriel Hydro Project5 MW10.1 km
Azusa3 MW10.2 km