John Hopkins Middle School Microgrid
Pinellas County, Florida · EIA plant ID 64752 · Operator: Duke Energy Florida, Inc
Nameplate3MWSummer 3 MW
Generators2in service
Net generation1GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2023
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 0 | — | — |
| 2024 | 1.8 | — | — |
| 2025 | 1.3 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ES1 | Batteries | BA | 2.5 | 2.5 | Nov 2023 | Operating | — | coming soon |
| PV1 | Solar Photovoltaic | PV | 0.8 | 0.8 | Sep 2023 | Operating | — | coming soon |
Owner / operator
Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Florida, Inc | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Bayboro | 170 MW | 2.2 km |
| P L Bartow | 1,476 MW | 11.4 km |
| Pinellas County Resource Recovery | 77 MW | 11.9 km |
| South Tampa Resiliency Project | 75 MW | 17.2 km |
| Riverside Solar | 55 MW | 19.5 km |
| Big Bend | 1,797 MW | 24.9 km |