P L Bartow
Pinellas County, Florida · EIA plant ID 634 · Operator: Duke Energy Florida, Inc
Nameplate1,476MWSummer 1,334 MW
Generators9in service
Net generation6,093GWh12 mo to Aug 2026
Capacity factor52%gas/coal/oil units, summer MW
Heat rate7,737Btu/kWhfossil units, electric fuel, HHV
First online1972Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 2,141.1 | — | — |
| 2002 | 2,194 | — | — |
| 2003 | 2,378.6 | 43.0% | 10,586 |
| 2004 | 2,182.7 | 39.4% | 10,782 |
| 2005 | 2,049.3 | 37.1% | 10,892 |
| 2006 | 1,678.4 | 30.9% | 10,954 |
| 2007 | 1,523.3 | 28.1% | 10,969 |
| 2008 | 1,374.6 | 25.9% | 11,309 |
| 2009 | 4,104.5 | 46.0% | 8,185 |
| 2010 | 7,034.8 | 61.3% | 7,492 |
| 2011 | 7,322.4 | 63.8% | 7,396 |
| 2012 | 6,858.1 | 59.6% | 7,560 |
| 2013 | 7,254.3 | 66.2% | 7,361 |
| 2014 | 6,807.2 | 60.7% | 7,814 |
| 2015 | 7,106.7 | 63.4% | 7,561 |
| 2016 | 6,639.7 | 58.4% | 8,088 |
| 2017 | 6,927.6 | 63.4% | 7,987 |
| 2018 | 7,070.8 | 63.5% | 7,754 |
| 2019 | 5,839.5 | 49.9% | 7,968 |
| 2020 | 6,822 | 60.7% | 7,638 |
| 2021 | 5,277.8 | 47.1% | 7,786 |
| 2022 | 6,630.5 | 59.1% | 7,722 |
| 2023 | 6,567.7 | 58.6% | 7,801 |
| 2024 | 6,300.5 | 54.8% | 7,624 |
| 2025 | 5,981.2 | 51.2% | 7,666 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo73,971 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas1,167
Net summer MW on oil1,167
Time gas → oilup to 24 h (EIA 24H)
Time oil → gasup to 24 h (EIA 24H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 4AGT | Natural Gas Fired Combined Cycle | CT | 208.2 | 174 | Jun 2009 | Operating | — | coming soon |
| 4BGT | Natural Gas Fired Combined Cycle | CT | 208.2 | 187 | Jun 2009 | Operating | — | coming soon |
| 4CGT | Natural Gas Fired Combined Cycle | CT | 208.2 | 190 | Jun 2009 | Operating | — | coming soon |
| 4DGT | Natural Gas Fired Combined Cycle | CT | 208.2 | 193 | Jun 2009 | Operating | — | coming soon |
| 4ST | Natural Gas Fired Combined Cycle | CA | 421.2 | 422 | Jun 2009 | Operating | — | coming soon |
| P1 | Petroleum Liquids | GT | 55.4 | 41 | May 1972 | Operating · retirement planned | Jun 2034 | coming soon |
| P2 | Natural Gas Fired Combustion Turbine | GT | 55.4 | 41 | Jun 1972 | Operating · retirement planned | Jun 2034 | coming soon |
| P3 | Petroleum Liquids | GT | 55.4 | 41 | Jun 1972 | Operating · retirement planned | Jun 2034 | coming soon |
| P4 | Natural Gas Fired Combustion Turbine | GT | 55.4 | 45 | Jun 1972 | Operating · retirement planned | Jun 2034 | coming soon |
| CC1 | Natural Gas Fired Combined Cycle | CC | 1,357 | 1,159 | planned Jun 2009 | not_current | — | coming soon |
| ST1 | Petroleum Liquids | ST | 127.5 | 122 | Sep 1958 | Retired Jun 2009 | — | coming soon |
| ST2 | Petroleum Liquids | ST | 127.5 | 103 | Aug 1961 | Retired Jun 2009 | — | coming soon |
| ST3 | Petroleum Liquids | ST | 239.3 | 201 | Jul 1963 | Retired Jun 2009 | — | coming soon |
Owner / operator
Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Florida, Inc | 100.0% | 1,476 MW |
Nearby plants
Within 80 km.
| Pinellas County Resource Recovery | 77 MW | 7.3 km |
| South Tampa Resiliency Project | 75 MW | 8.3 km |
| John Hopkins Middle School Microgrid | 3 MW | 11.4 km |
| Bayboro | 170 MW | 11.8 km |
| TIA Solar | 2 MW | 13.6 km |
| Howard F Curren Advncd Wastewater Plant | 3 MW | 18.3 km |