South Tampa Resiliency Project
Hillsborough County, Florida · EIA plant ID 66920 · Operator: Tampa Electric Co
Nameplate75MWSummer 73 MW
Generators4in service
Net generation23GWh12 mo to Dec 2025
Capacity factor7%gas/coal/oil units, summer MW
Heat rate8,861Btu/kWhfossil units, electric fuel, HHV
First online2025Runs as peaking
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 22.6 | 7.1% | 8,861 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MPS01 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.2 | Feb 2025 | Operating | — | coming soon |
| MPS02 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.2 | Feb 2025 | Operating | — | coming soon |
| MPS03 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.2 | Dec 2025 | Operating | — | coming soon |
| MPS04 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.2 | Dec 2025 | Operating | — | coming soon |
Owner / operator
Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Tampa Electric Co | 100.0% | 75 MW |
Nearby plants
Within 80 km.
| P L Bartow | 1,476 MW | 8.3 km |
| H L Culbreath Bayside Power Station | 2,294 MW | 10.5 km |
| Howard F Curren Advncd Wastewater Plant | 3 MW | 11.4 km |
| TIA Solar | 2 MW | 11.5 km |
| Bayside Battery Storage | 20 MW | 11.5 km |
| Mosaic Co Tampa Facility | 72 MW | 12.5 km |