South Tampa Resiliency Project

Hillsborough County, Florida · EIA plant ID 66920 · Operator: Tampa Electric Co
Natural gasNatural Gas Internal Combustion EngineBA: TEC
Nameplate75MWSummer 73 MW
Generators4in service
Net generation23GWh12 mo to Dec 2025
Capacity factor7%gas/coal/oil units, summer MW
Heat rate8,861Btu/kWhfossil units, electric fuel, HHV
First online2025Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%202520267.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,8618,8618,8618,861202520268,861 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202522.67.1%8,861

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MPS01Natural Gas Internal Combustion EngineIC18.818.2Feb 2025Operating—coming soon
MPS02Natural Gas Internal Combustion EngineIC18.818.2Feb 2025Operating—coming soon
MPS03Natural Gas Internal Combustion EngineIC18.818.2Dec 2025Operating—coming soon
MPS04Natural Gas Internal Combustion EngineIC18.818.2Dec 2025Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%75 MW

Nearby plants

Within 80 km.
P L Bartow1,476 MW8.3 km
H L Culbreath Bayside Power Station2,294 MW10.5 km
Howard F Curren Advncd Wastewater Plant3 MW11.4 km
TIA Solar2 MW11.5 km
Bayside Battery Storage20 MW11.5 km
Mosaic Co Tampa Facility72 MW12.5 km