← Back to map

Bayside Battery Storage

Hillsborough County, Florida · EIA plant ID 69165 · Operator: Tampa Electric Co
BatteryBatteriesBA: TEC
Nameplate20MWSummer 20 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESS1BatteriesBA2020Apr 2026Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%20 MW

Nearby plants

Within 80 km.
H L Culbreath Bayside Power Station2,294 MW1.2 km
Howard F Curren Advncd Wastewater Plant3 MW4.4 km
McKay Bay Facility22 MW4.8 km
IKEA Tampa 0421 MW5.6 km
Mosaic Co Tampa Facility72 MW5.6 km
Hillsborough County Resource Recovery47 MW8.7 km