IKEA Tampa 042
Hillsborough County, Florida · EIA plant ID 58012 · Operator: IKEA Property Inc
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Aug 2026
Capacity factor0%solar units, summer MW
Heat rate—thermal plants only
First online2012
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 0.7 | 18.0% | — |
| 2013 | 1.8 | 20.2% | — |
| 2014 | 1.7 | 19.6% | — |
| 2015 | 1.7 | 18.9% | — |
| 2016 | 1.8 | 20.2% | — |
| 2017 | 1.6 | 18.1% | — |
| 2018 | 1.7 | 19.2% | — |
| 2019 | 1.7 | 19.5% | — |
| 2020 | 1.1 | 12.9% | — |
| 2021 | 1.3 | 15.2% | — |
| 2022 | 1.6 | 18.0% | — |
| 2023 | 1.6 | 18.4% | — |
| 2024 | 1.1 | 12.6% | — |
| 2025 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV | Solar Photovoltaic | PV | 1 | 1 | Aug 2012 | Operating (Out of service, expected back within the year) | — | coming soon |
Owner / operator
Operator: IKEA Property Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| IKEA Property Inc | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| McKay Bay Facility | 22 MW | 1.2 km |
| Howard F Curren Advncd Wastewater Plant | 3 MW | 1.8 km |
| H L Culbreath Bayside Power Station | 2,294 MW | 5.3 km |
| Bayside Battery Storage | 20 MW | 5.6 km |
| Hillsborough County Resource Recovery | 47 MW | 9 km |
| TIA Solar | 2 MW | 9.9 km |