Big Bend
Hillsborough County, Florida · EIA plant ID 645 · Operator: Tampa Electric Co
×891 MW natural gas retired since 2020 (latest Apr 2023)
Nameplate1,797MWSummer 1,491 MW
Generators5in service
Net generation6,544GWh12 mo to Aug 2026
Capacity factor54%gas/coal/oil units, summer MW
Heat rate6,965Btu/kWhfossil units, electric fuel, HHV
First online1970Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 9,259.7 | — | — |
| 2002 | 8,518.2 | — | — |
| 2003 | 8,610.6 | 53.1% | 11,119 |
| 2004 | 9,092.9 | 56.3% | 10,915 |
| 2005 | 8,442.3 | 53.0% | 11,201 |
| 2006 | 9,422.7 | 62.9% | 10,865 |
| 2007 | 8,608.9 | 59.1% | 10,837 |
| 2008 | 8,727.6 | 60.6% | 10,835 |
| 2009 | 8,326.8 | 59.4% | 10,589 |
| 2010 | 9,044.8 | 64.2% | 10,204 |
| 2011 | 9,425.7 | 66.9% | 10,440 |
| 2012 | 9,556.4 | 68.1% | 10,483 |
| 2013 | 9,546.2 | 68.2% | 10,483 |
| 2014 | 10,127.2 | 69.7% | 10,407 |
| 2015 | 7,558.6 | 52.0% | 10,580 |
| 2016 | 7,303.8 | 50.1% | 10,791 |
| 2017 | 5,577.6 | 38.1% | 11,019 |
| 2018 | 4,787.6 | 32.7% | 11,116 |
| 2019 | 3,889.9 | 26.5% | 11,880 |
| 2020 | 3,129.6 | 21.2% | 11,469 |
| 2021 | 3,279.1 | 21.9% | 11,662 |
| 2022 | 2,898.3 | 16.9% | 10,065 |
| 2023 | 4,821.3 | 33.3% | 7,255 |
| 2024 | 7,169.2 | 52.5% | 7,110 |
| 2025 | 7,473.4 | 57.0% | 7,034 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas56
Net summer MW on oil56
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GT4 | Natural Gas Fired Combustion Turbine | GT | 69.9 | 56 | Aug 2009 | Operating | — | coming soon |
| GT5 | Natural Gas Fired Combined Cycle | CT | 397.8 | 360 | Dec 2021 | Operating | — | coming soon |
| GT6 | Natural Gas Fired Combined Cycle | CT | 397.8 | 360 | Dec 2021 | Operating | — | coming soon |
| ST1 | Natural Gas Fired Combined Cycle | CA | 445.5 | 335 | Oct 1970 | Operating | — | coming soon |
| ST4 | Natural Gas Steam Turbine | ST | 486 | 380 | Feb 1985 | Operating · retirement planned | Jan 2040 | coming soon |
| 1 | Solar Photovoltaic | PV | 19.8 | 19.8 | Feb 2017 | not_current | — | coming soon |
| BBST1 | Natural Gas Steam Turbine | ST | 445.5 | 335 | planned Jan 2023 | not_current | — | coming soon |
| BESS1 | Batteries | BA | 12.6 | 12.6 | Feb 2017 | not_current | — | coming soon |
| GT1 | Petroleum Liquids | GT | 18 | 10 | Feb 1969 | Retired Dec 2008 | — | coming soon |
| GT2 | Petroleum Liquids | GT | 78.7 | 49 | Nov 1974 | Retired Dec 2008 | — | coming soon |
| GT3 | Petroleum Liquids | GT | 78.7 | 39 | Nov 1974 | Retired Dec 2008 | — | coming soon |
| ST2 | Conventional Steam Coal | ST | 445.5 | 385 | Apr 1973 | Retired Dec 2021 | — | coming soon |
| ST3 | Natural Gas Steam Turbine | ST | 445.5 | 395 | May 1976 | Retired Apr 2023 | — | coming soon |
Owner / operator
Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Tampa Electric Co | 100.0% | 1,797 MW |
Nearby plants
Within 80 km.
| Big Bend Floating Solar I | 1 MW | 1.1 km |
| Big Bend Agrivoltaics | 1 MW | 1.3 km |
| Big Bend II Solar | 46 MW | 1.9 km |
| Big Bend 1 Solar and Battery Storage | 32 MW | 2.1 km |
| Mosaic Co Tampa Facility | 72 MW | 7.5 km |
| Little Manatee River Solar | 75 MW | 10.5 km |