Hornet SolarUnder construction

Gaston County, North Carolina · EIA plant ID 64167 · Operator: Hornet Solar
SolarBA: DUK

73 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 73 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GENSolar PhotovoltaicPV7373planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Hornet Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Lincoln Combustion2,156 MW5 km
Freemont Solar Center LLC5 MW5.4 km
Mariposa Solar Center LLC5 MW5.5 km
Mountain Island60 MW7 km
DE Solar 1725 Drywall Drretired7.4 km
McDowell Creek Solar LLC—7.8 km