Gaston County, North Carolina · EIA plant ID 57336 · Operator: Duke Energy Carolinas, LLC
SolarBA: DUK

×1 MW solar retired since 2020 (latest Jul 2025)

Nameplate—MWSummer — MW
Generators0in service
Net generation1GWh12 mo to Dec 2025
Capacity factor14%no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20102012201420162018202020222024202614.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20101.517.6%—
20110.44.3%—
20120.55.3%—
20131.517.6%—
20141.517.6%—
20151.517.6%—
20161.719.0%—
20171.517.6%—
20181.415.8%—
20191.314.7%—
20201.315.0%—
20210.89.3%—
2022111.1%—
20230.89.1%—
20240.910.3%—
20250.614.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV01Solar PhotovoltaicPV11Jan 2010Retired Jul 2025—coming soon

Owner / operator

Operator: Duke Energy Carolinas, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Mountain Island60 MW1.3 km
Reventure Park4 MW3.5 km
Hornet Solar—7.4 km
DE Solar 10240 Old Dowd Rdretired8.9 km
McDowell Creek Solar LLC—9 km
Mariposa Solar Center LLC5 MW9.8 km