Mariposa Solar Center LLC

Gaston County, North Carolina · EIA plant ID 59162 · Operator: Heelstone Energy Holdings, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202619.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20162.214.8%—
20179.722.2%—
20189.321.2%—
20199.220.9%—
20208.519.3%—
20218.920.4%—
20228.920.2%—
20239.120.8%—
20248.920.2%—
20258.519.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MSC 1Solar PhotovoltaicPV55Sep 2016Operating—coming soon

Owner / operator

Operator: Heelstone Energy Holdings, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Heelstone Energy Holdings, LLC100.0%5 MW

Nearby plants

Within 80 km.
Hornet Solar—5.5 km
Gaston Solar Power Plant25 MW7.2 km
Gaston County Renewable Energy Center4 MW7.8 km
Lincoln Combustion2,156 MW8 km
Long Creek Waste Water Plant5 MW8.5 km
Auten Road Farm, LLC5 MW8.9 km