← Back to map

Neptune Energy Center Hybrid

Pueblo County, Colorado · EIA plant ID 63731 · Operator: Neptune Energy Center, LLC
SolarBatteriesSolar PhotovoltaicBA: PSCO
Nameplate450MWSummer 450 MW
Generators2in service
Net generation621GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202722.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202341125.3%—
2024686.924.8%—
2025679.324.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NT125BatteriesBA125125Jun 2023Operating—coming soon
NT325Solar PhotovoltaicPV325325Jun 2023Operating—coming soon

Owner / operator

Operator: Neptune Energy Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Neptune Energy Center, LLC100.0%450 MW

Nearby plants

Within 80 km.
Pueblo Airport Generating Station440 MW9.8 km
Trane Pueblo1 MW10.5 km
CEC Solar #1117, LLC2 MW10.9 km
Airport Industrial10 MW11.4 km
Waxwing Solar CSG—12.6 km
CSU Pueblo1 MW14.7 km