← Back to map

CSU Pueblo

Pueblo County, Colorado · EIA plant ID 58481 · Operator: Scale Sustainable I, LLC
SolarSolar PhotovoltaicBA: WACM
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2008

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202619.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20131.921.3%—
20141.820.2%—
20151.718.9%—
20161.820.5%—
20171.618.1%—
20181.821.1%—
20191.820.6%—
20201.820.9%—
20212.124.0%—
20221.517.2%—
20231.112.8%—
20241.820.3%—
20251.719.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CSU1Solar PhotovoltaicPV11Dec 2008Operating—coming soon

Owner / operator

Operator: Scale Sustainable I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Scale Sustainable I, LLC100.0%1 MW

Nearby plants

Within 80 km.
Waxwing Solar CSG—2.6 km
Airport Industrial10 MW4.9 km
Pueblo Airport Generating Station440 MW5 km
CEC Solar #1117, LLC2 MW5.5 km
Trane Pueblo1 MW6.1 km
Comanche (CO)1,253 MW10.9 km