CEC Solar #1117, LLC
Pueblo County, Colorado · EIA plant ID 60801 · Operator: Altus Power America Management, LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2018
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 1.7 | 31.4% | — |
| 2019 | 4.2 | 31.8% | — |
| 2020 | 4 | 30.2% | — |
| 2021 | 5.1 | 39.1% | — |
| 2022 | 3.8 | 28.9% | — |
| 2023 | 7.2 | 54.9% | — |
| 2024 | 3.3 | 25.3% | — |
| 2025 | 3.7 | 28.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PUEB2 | Solar Photovoltaic | PV | 1.5 | 1.5 | Aug 2018 | Operating | — | coming soon |
Owner / operator
Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Altus Power America Management, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Airport Industrial | 10 MW | 0.6 km |
| Trane Pueblo | 1 MW | 0.7 km |
| Waxwing Solar CSG | — | 2.8 km |
| Pueblo Airport Generating Station | 440 MW | 4.1 km |
| CSU Pueblo | 1 MW | 5.5 km |
| Comanche Solar | 120 MW | 9.6 km |