← Back to map

Waxwing Solar CSGUnder construction

Pueblo County, Colorado · EIA plant ID 69427 · Operator: Waxwing Solar
SolarBA: PSCO

3 MW under construction (Solar Photovoltaic), first expected Jan 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 3 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WAXWISolar PhotovoltaicPV33planned Jan 2027Under construction—coming soon

Owner / operator

Operator: Waxwing Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Airport Industrial10 MW2.3 km
CSU Pueblo1 MW2.6 km
CEC Solar #1117, LLC2 MW2.8 km
Trane Pueblo1 MW3.5 km
Pueblo Airport Generating Station440 MW3.6 km
Comanche (CO)1,253 MW10 km