San Miguel II Solar Energy Center

San Miguel County, New Mexico · EIA plant ID 63082 · Operator: PNM Resources
SolarSolar PhotovoltaicBA: PNM
Nameplate10MWSummer 10 MW
Generators1in service
Net generation27GWh12 mo to Dec 2025
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2019202020212022202320242025202630.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20194.821.9%—
202025.629.2%—
202127.331.2%—
202226.530.3%—
202326.330.0%—
202426.930.7%—
202526.630.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SMIISolar PhotovoltaicPV1010Oct 2019Operating—coming soon

Owner / operator

Operator: PNM Resources. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PNM Resources100.0%10 MW

Nearby plants

Within 80 km.
San Miguel I Solar Energy Center10 MW0.5 km
Storrie Lake Solar Project2 MW2.7 km
Las Vegas Solar Energy Center5 MW3.2 km
Pluma - Pino5 MW5 km
Juniper Sol Solar CSG5 MW71.8 km