← Back to map

Las Vegas Solar Energy Center

San Miguel County, New Mexico · EIA plant ID 57576 · Operator: PNM Resources
SolarSolar PhotovoltaicBA: PNM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202620.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2011114.0%—
201210.924.9%—
201310.724.5%—
201410.423.8%—
20159.722.2%—
201610.523.9%—
201710.123.1%—
20189.722.3%—
20199.922.5%—
20209.922.4%—
20211022.9%—
202210.123.1%—
20239.922.7%—
20249.722.1%—
2025920.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LVSECSolar PhotovoltaicPV55Nov 2011Operating—coming soon

Owner / operator

Operator: PNM Resources. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Public Service Co of NM100.0%5 MW

Nearby plants

Within 80 km.
Pluma - Pino5 MW2.3 km
Storrie Lake Solar Project2 MW2.6 km
San Miguel I Solar Energy Center10 MW2.7 km
San Miguel II Solar Energy Center10 MW3.2 km
Juniper Sol Solar CSG5 MW69 km
Santa Fe Solar Energy Center10 MW77.5 km