← Back to map

Storrie Lake Solar Project

San Miguel County, New Mexico · EIA plant ID 58794 · Operator: MSM Solar LLC
SolarSolar PhotovoltaicBA: PNM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202617.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20141.213.2%—
2015322.5%—
20163.425.8%—
20173.425.5%—
20183.425.9%—
20193.224.2%—
20203.425.9%—
20213.324.9%—
20223.425.7%—
20232.518.8%—
2024323.0%—
20252.317.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MSMPVSolar PhotovoltaicPV1.51.5May 2014Operating—coming soon

Owner / operator

Operator: MSM Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MSM Solar LLC100.0%2 MW

Nearby plants

Within 80 km.
San Miguel I Solar Energy Center10 MW2.5 km
Las Vegas Solar Energy Center5 MW2.6 km
San Miguel II Solar Energy Center10 MW2.7 km
Pluma - Pino5 MW4.9 km
Juniper Sol Solar CSG5 MW71.4 km
Santa Fe Solar Energy Center10 MW79.6 km