← Back to map

Reedley Community College Solar

Fresno County, California · EIA plant ID 63074 · Operator: Forefront Power, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2019202020212022202320242025202617.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20193.816.7%—
20203.816.5%—
20213.816.8%—
20223.917.2%—
2023417.4%—
20243.816.6%—
20253.917.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
234Solar PhotovoltaicPV2.62.6Dec 2018Operating—coming soon

Owner / operator

Operator: Forefront Power, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Forefront Power, LLC100.0%3 MW

Nearby plants

Within 80 km.
Moonlight Packing - Phase 21 MW2.5 km
Dinuba Energyretired5.1 km
FTF-PackingShed1 MW7 km
Dinuba Wastewater Treatment Plant1 MW8 km
2081 Terzian Solar Project1 MW8.1 km
Algonquin Power Sanger LLC62 MW12.1 km