← Back to map

Dinuba Wastewater Treatment Plant

Tulare County, California · EIA plant ID 57827 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202614.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20110.214.2%—
20121.921.9%—
2013222.5%—
20141.922.1%—
20151.820.0%—
20161.820.5%—
20171.921.3%—
20181.820.7%—
20191.618.2%—
20201.719.8%—
20211.516.8%—
20221.416.2%—
20231.617.8%—
20241.415.7%—
20251.314.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DSPVSolar PhotovoltaicPV11Nov 2011Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PNC Energy Capital LLC100.0%1 MW

Nearby plants

Within 80 km.
FTF-PackingShed1 MW1 km
Dinuba Energyretired3.8 km
Agriculture Capital - Legacy Packing2 MW6 km
Moonlight Packing - Phase 21 MW6.6 km
Reedley Community College Solar3 MW8 km
Elkhorn Dairy1 MW10.2 km