Dinuba EnergyRetired
Tulare County, California · EIA plant ID 60100 · Operator: Dinuba Energy
×12 MW other retired since 2020 (latest Jul 2024)
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 42.9 | 42.4% | 18,274 |
| 2016 | 0 | 0.0% | — |
| 2017 | 0 | 0.0% | — |
| 2018 | 0 | 0.0% | — |
| 2019 | 0 | 0.0% | — |
| 2020 | 0 | 0.0% | — |
| 2021 | 0 | 0.0% | — |
| 2022 | 0 | 0.0% | — |
| 2023 | 0 | 0.0% | — |
| 2024 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| G-1 | Wood/Wood Waste Biomass | ST | 11.5 | 11.5 | Oct 1985 | Retired Jul 2024 | — | coming soon |
Owner / operator
Operator: Dinuba Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| FTF-PackingShed | 1 MW | 2.9 km |
| Dinuba Wastewater Treatment Plant | 1 MW | 3.8 km |
| Moonlight Packing - Phase 2 | 1 MW | 4.8 km |
| Reedley Community College Solar | 3 MW | 5.1 km |
| Agriculture Capital - Legacy Packing | 2 MW | 9.6 km |
| 2081 Terzian Solar Project | 1 MW | 11 km |