Algonquin Power Sanger LLC
Fresno County, California · EIA plant ID 57564 · Operator: Algonquin Power Sanger LLC
Nameplate62MWSummer 62 MW
Generators2in service
Net generation3GWh12 mo to Aug 2026
Capacity factor1%gas/coal/oil units, summer MW
Heat rate9,045Btu/kWhfossil units, electric fuel, HHV
First online2007Runs as rarely runs
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2010 | 129.6 | 24.1% | 7,384 |
| 2011 | 131.5 | 24.4% | 7,345 |
| 2012 | 101.4 | 19.4% | 7,622 |
| 2013 | 138.9 | 25.8% | 7,549 |
| 2014 | 135.4 | 25.1% | 8,332 |
| 2015 | 130.9 | 24.3% | 8,446 |
| 2016 | 120.3 | 22.3% | 7,105 |
| 2017 | 88.6 | 16.4% | 8,360 |
| 2018 | 176.1 | 32.7% | 6,997 |
| 2019 | 74.7 | 13.9% | 7,430 |
| 2020 | 72.8 | 13.5% | 7,275 |
| 2021 | 172.2 | 32.0% | 7,018 |
| 2022 | 177 | 32.9% | 7,214 |
| 2023 | 14.9 | 2.8% | 9,961 |
| 2024 | 9.9 | 1.8% | 8,969 |
| 2025 | 3.6 | 0.7% | 9,099 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CTG | Natural Gas Fired Combined Cycle | CT | 49 | 49 | Dec 2007 | Operating | — | coming soon |
| STG2 | Natural Gas Fired Combined Cycle | CA | 12.5 | 12.5 | May 2012 | Operating | — | coming soon |
| STG | Natural Gas Fired Combined Cycle | CA | 12.5 | 12.5 | Nov 1990 | Retired Mar 2012 | — | coming soon |
Owner / operator
Operator: Algonquin Power Sanger LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Algonquin Power Sanger LLC | 100.0% | 62 MW |
Nearby plants
Within 80 km.
| POM Plant 1 | 2 MW | 4.2 km |
| POM Plant 2 | 2 MW | 4.7 km |
| CA - Fresno, City of - SE Surface WTP | 3 MW | 11.4 km |
| Sanger USD - Sanger West HS | — | 11.9 km |
| Reedley Community College Solar | 3 MW | 12.1 km |
| 2081 Terzian Solar Project | 1 MW | 12.3 km |