← Back to map

Antelope Expansion 3B

Los Angeles County, California · EIA plant ID 62674 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation13GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20212022202320242025202628.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20217.428.8%—
202213.430.6%—
202311.426.0%—
20241125.0%—
202512.628.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ANX3BSolar PhotovoltaicPV55Jun 2021Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%5 MW

Nearby plants

Within 80 km.
North Lancaster Ranch20 MW0.9 km
Antelope Expansion 3A15 MW1 km
Summer Solar LLC20 MW1.2 km
Western Antelope Blue Sky B20 MW1.6 km
Elevation Solar C40 MW2 km
Central Antelope Dry Ranch C20 MW2 km