SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 19 MW
Generators1in service
Net generation52GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202631.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20164.127.8%—
20175430.8%—
201857.234.4%—
20195533.0%—
202055.133.0%—
202154.732.9%—
202253.932.4%—
202349.329.6%—
202450.230.1%—
202552.231.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WABSBSolar PhotovoltaicPV2019Dec 2016Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Western Antelope Blue Sky Ranch B100.0%20 MW

Nearby plants

Within 80 km.
Antelope Expansion 3A15 MW0.9 km
Elevation Solar C40 MW0.9 km
Antelope DSR 320 MW1 km
North Lancaster Ranch20 MW1.4 km
Antelope Expansion 2105 MW1.5 km
Antelope Expansion 3B5 MW1.6 km