Summer Solar LLC

Los Angeles County, California · EIA plant ID 60280 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 19 MW
Generators1in service
Net generation56GWh12 mo to Dec 2025
Capacity factor34%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202633.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201623.426.5%—
201756.132.0%—
201857.134.3%—
201954.632.8%—
202054.332.5%—
202155.533.3%—
202264.838.9%—
202340.924.6%—
202449.129.4%—
202555.933.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SUMSLSolar PhotovoltaicPV2019Jul 2016Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%20 MW

Nearby plants

Within 80 km.
North Lancaster Ranch20 MW0.6 km
TA-High Desert LLC20 MW0.9 km
Central Antelope Dry Ranch C20 MW1.2 km
Antelope Expansion 3B5 MW1.2 km
Central Antelope Dry Ranch B LLC3 MW1.3 km
Elevation Solar C40 MW1.8 km