← Back to map

TA-High Desert LLC

Los Angeles County, California · EIA plant ID 58149 · Operator: TA-High Desert LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation58GWh12 mo to Dec 2025
Capacity factor33%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202633.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201344.430.2%—
201457.733.0%—
201557.232.7%—
201655.931.8%—
201755.331.5%—
201856.232.0%—
201949.828.4%—
202049.728.3%—
202151.129.1%—
202247.427.0%—
202345.425.9%—
202456.832.4%—
202557.933.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TAHDSolar PhotovoltaicPV2020Mar 2013Operating—coming soon

Owner / operator

Operator: TA-High Desert LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
TA-High Desert LLC100.0%20 MW

Nearby plants

Within 80 km.
Central Antelope Dry Ranch B LLC3 MW0.5 km
Summer Solar LLC20 MW0.9 km
Central Antelope Dry Ranch C20 MW1.3 km
North Lancaster Ranch20 MW1.4 km
Rodeo Solar C22 MW1.5 km
Rodeo Solar D22 MW1.5 km