← Back to map

Rodeo Solar D2

Los Angeles County, California · EIA plant ID 58752 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202626.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2014222.5%—
20153.929.9%—
20163.828.7%—
20173.828.8%—
20183.829.1%—
20193.526.7%—
20203.828.8%—
20213.325.4%—
20223.224.0%—
20233.526.7%—
20242.620.0%—
20253.526.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RSD2Solar PhotovoltaicPV1.51.5May 2014Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%2 MW

Nearby plants

Within 80 km.
Rodeo Solar C22 MW0 km
Lancaster Dry Farm Ranch B5 MW0.4 km
Portal Ridge Solar B, LLC20 MW0.8 km
Summer Solar A22 MW1.1 km
Summer Solar D21 MW1.1 km
Summer Solar C22 MW1.1 km