Citrus Ridge Solar

Orange County, Florida · EIA plant ID 61988 · Operator: FL Solar 5, LLC
SolarSolar PhotovoltaicBA: FPC
Nameplate52MWSummer 52 MW
Generators1in service
Net generation94GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202620.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.82.0%—
201997.921.5%—
2020101.222.2%—
2021100.222.0%—
202285.218.7%—
202369.315.2%—
202486.118.9%—
20259520.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FL501Solar PhotovoltaicPV5252Dec 2018Operating—coming soon

Owner / operator

Operator: FL Solar 5, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FL Solar 5, LLC100.0%52 MW

Nearby plants

Within 80 km.
Harvest Power Orlandoretired3.7 km
Central Energy Plantretired4.5 km
Walt Disney World Solar Facility5 MW6.1 km
Cane Island706 MW16.1 km
Intercession City1,197 MW16.7 km
Orlando Cogen LP122 MW20.5 km