← Back to map

Harvest Power OrlandoRetired

Orange County, Florida · EIA plant ID 59151 · Operator: Harvest Power Orlando LLC
OtherBA: FPC

×3 MW other retired since 2020 (latest Jul 2020)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh2014201520162017201820192020

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%201320142015201620172018201920202021

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201302.0%—
20141139.1%—
201514.652.0%—
201616.960.1%—
201720.773.9%—
201819.770.2%—
201921.576.8%—
202000.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CHP 1Other Waste BiomassIC1.61.6Dec 2013Retired Jul 2020—coming soon
CHP 2Other Waste BiomassIC1.61.6Dec 2013Retired Jul 2020—coming soon

Owner / operator

Operator: Harvest Power Orlando LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Walt Disney World Solar Facility5 MW2.7 km
Citrus Ridge Solar52 MW3.7 km
Central Energy Plantretired5.7 km
Cane Island706 MW12.4 km
Intercession City1,197 MW13.3 km
Orlando Cogen LP122 MW18.9 km