Orlando Cogen LP
Orange County, Florida · EIA plant ID 54466 · Operator: Florida Municipal Power Agency
Nameplate122MWSummer 120 MW
Generators1in service
Net generation348GWh12 mo to Dec 2025
Capacity factor33%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1993Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 894.6 | — | — |
| 2002 | 860.5 | — | — |
| 2003 | 917.5 | 91.7% | 8,188 |
| 2004 | 776.1 | 73.6% | 7,994 |
| 2005 | 862.3 | 82.0% | 7,994 |
| 2006 | 948.2 | 90.2% | 7,994 |
| 2007 | 952 | 90.6% | 7,886 |
| 2008 | 680.5 | 64.6% | 7,882 |
| 2009 | 904.8 | 86.1% | 7,884 |
| 2010 | 873.6 | 83.1% | 7,888 |
| 2011 | 768.2 | 73.1% | 7,895 |
| 2012 | 807.1 | 76.6% | 7,897 |
| 2013 | 823.6 | 78.3% | 7,896 |
| 2014 | 906.9 | 86.3% | 7,878 |
| 2015 | 987.5 | 93.9% | 7,874 |
| 2016 | 1,025.6 | 97.3% | 7,697 |
| 2017 | 926 | 88.1% | 7,694 |
| 2018 | 1,022.1 | 97.2% | 7,695 |
| 2019 | 1,014.1 | 96.5% | 7,698 |
| 2020 | 948.4 | 90.0% | 7,700 |
| 2021 | 1,020.7 | 97.1% | 7,697 |
| 2022 | 1,020.6 | 97.1% | 7,699 |
| 2023 | 1,015.3 | 96.6% | 7,700 |
| 2024 | 704.8 | 66.9% | 7,699 |
| 2025 | 348 | 33.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combined Cycle | CS | 122.4 | 120 | Sep 1993 | Operating | — | coming soon |
Owner / operator
Operator: Florida Municipal Power Agency. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Florida Municipal Power Agency | 100.0% | 122 MW |
Nearby plants
Within 80 km.
| Walt Disney World Solar Facility | 5 MW | 16.6 km |
| Central Energy Plant | retired | 16.6 km |
| Harvest Power Orlando | retired | 18.9 km |
| Citrus Ridge Solar | 52 MW | 20.5 km |
| Cane Island | 706 MW | 21.9 km |
| Lockheed Martin Solar | 5 MW | 22 km |