Walt Disney World Solar Facility

Orange County, Florida · EIA plant ID 59973 · Operator: Duke Energy Florida Solar Solutions
SolarSolar PhotovoltaicBA: FPC
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20167.420.6%—
20178.419.5%—
20188.319.4%—
20196.715.7%—
20208.118.9%—
20218.219.0%—
20228.118.9%—
20238.219.2%—
2024818.6%—
20257.517.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WDS1Solar PhotovoltaicPV4.94.9Mar 2016Operating—coming soon
XXXXXSolar PhotovoltaicPV4.94.9planned Jan 2016not_current—coming soon

Owner / operator

Operator: Duke Energy Florida Solar Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Florida Solar Solutions100.0%5 MW

Nearby plants

Within 80 km.
Harvest Power Orlandoretired2.7 km
Citrus Ridge Solar52 MW6.1 km
Central Energy Plantretired6.1 km
Cane Island706 MW11.2 km
Intercession City1,197 MW12.4 km
Orlando Cogen LP122 MW16.6 km