El Dorado Springs Solar Farm

Cedar County, Missouri · EIA plant ID 61566 · Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202617.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20182.922.3%—
20193.717.0%—
20204.419.9%—
20214.520.3%—
20224.620.8%—
20234.420.0%—
20244.219.0%—
20253.817.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
EDSF1Solar PhotovoltaicPV2.52.5Jun 2018Operating—coming soon

Owner / operator

Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MPUA100.0%3 MW

Nearby plants

Within 80 km.
Stockton Hydro52 MW27.5 km
Nevada22 MW30 km
Beavertail Solar—50.7 km
Buffalo Branch Wind and Solar LLC—53.2 km
Butler Municipal Power Plant11 MW54.1 km
Butler Solar Power Project3 MW54.9 km