Butler Solar Power Project

Bates County, Missouri · EIA plant ID 58959 · Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Aug 2026
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2014

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202617.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20144.119.8%—
20154.618.7%—
20164.719.1%—
20174.518.4%—
20184.116.7%—
20194.116.6%—
20204.216.9%—
20214.217.1%—
20224.317.5%—
20234.518.3%—
20244.518.3%—
20254.216.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BSF1Solar PhotovoltaicPV2.82.8Mar 2014Operating—coming soon

Owner / operator

Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MPUA100.0%3 MW

Nearby plants

Within 80 km.
Butler Municipal Power Plant11 MW0.8 km
Swan Solar—22.3 km
La Cygne1,599 MW27.2 km
Beavertail Solar—36.5 km
Nevada22 MW46.7 km
South Harper351 MW47.1 km