← Back to map

Beavertail SolarUnder construction

Henry County, Missouri · EIA plant ID 68917 · Operator: Beavertail Solar, LLC
SolarBA: SPA

400 MW under construction (Solar Photovoltaic), first expected Apr 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 400 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BSSolar PhotovoltaicPV400400planned Apr 2027Under construction—coming soon

Owner / operator

Operator: Beavertail Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Butler Municipal Power Plant11 MW36.1 km
Butler Solar Power Project3 MW36.5 km
Harry Truman161 MW46.5 km
Holden321 MW49.4 km
El Dorado Springs Solar Farm3 MW50.7 km
Swan Solar—57.7 km