Nevada
Vernon County, Missouri · EIA plant ID 2090 · Operator: KCP&L Greater Missouri Operations
Nameplate22MWSummer 17 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1974Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 0.2 | 0.1% | — |
| 2002 | -0.2 | -0.1% | — |
| 2003 | 0.1 | 0.1% | — |
| 2004 | -0.1 | -0.1% | — |
| 2005 | -0.1 | -0.0% | — |
| 2006 | -0.1 | -0.1% | — |
| 2007 | -0.2 | -0.1% | — |
| 2008 | -0 | -0.0% | — |
| 2009 | -0.1 | -0.1% | — |
| 2010 | -0.1 | -0.0% | — |
| 2011 | -0 | -0.0% | — |
| 2012 | -0.1 | -0.0% | — |
| 2013 | -0.1 | -0.1% | — |
| 2014 | -0.1 | -0.1% | — |
| 2015 | -0.1 | -0.1% | — |
| 2016 | -0.1 | -0.1% | — |
| 2017 | -0.1 | -0.0% | — |
| 2018 | -0.1 | -0.1% | — |
| 2019 | 0.1 | 0.0% | — |
| 2020 | 0 | 0.0% | — |
| 2021 | 1.3 | 0.9% | 29,063 |
| 2022 | 1.8 | 1.3% | 15,927 |
| 2023 | 1.1 | 0.8% | 21,887 |
| 2024 | 0.3 | 0.3% | — |
| 2025 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Petroleum Liquids | GT | 21.6 | 17.3 | Jun 1974 | Operating | — | coming soon |
Owner / operator
Operator: KCP&L Greater Missouri Operations. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| KCP&L Greater Missouri Operations | 100.0% | 22 MW |
Nearby plants
Within 80 km.
| El Dorado Springs Solar Farm | 3 MW | 30 km |
| Oak Grove Power Producers | 4 MW | 35.8 km |
| Butler Municipal Power Plant | 11 MW | 46 km |
| Butler Solar Power Project | 3 MW | 46.7 km |
| North Fork Ridge Wind Energy Center | 149 MW | 53.2 km |
| Stockton Hydro | 52 MW | 53.5 km |