← Back to map

Nevada

Vernon County, Missouri · EIA plant ID 2090 · Operator: KCP&L Greater Missouri Operations
OilPetroleum LiquidsSPPBA: SWPP
Nameplate22MWSummer 17 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1974Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%200520102015202020250.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,00030,0002021202220232024
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.20.1%—
2002-0.2-0.1%—
20030.10.1%—
2004-0.1-0.1%—
2005-0.1-0.0%—
2006-0.1-0.1%—
2007-0.2-0.1%—
2008-0-0.0%—
2009-0.1-0.1%—
2010-0.1-0.0%—
2011-0-0.0%—
2012-0.1-0.0%—
2013-0.1-0.1%—
2014-0.1-0.1%—
2015-0.1-0.1%—
2016-0.1-0.1%—
2017-0.1-0.0%—
2018-0.1-0.1%—
20190.10.0%—
202000.0%—
20211.30.9%29,063
20221.81.3%15,927
20231.10.8%21,887
20240.30.3%—
202500.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT21.617.3Jun 1974Operating—coming soon

Owner / operator

Operator: KCP&L Greater Missouri Operations. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
KCP&L Greater Missouri Operations100.0%22 MW

Nearby plants

Within 80 km.
El Dorado Springs Solar Farm3 MW30 km
Oak Grove Power Producers4 MW35.8 km
Butler Municipal Power Plant11 MW46 km
Butler Solar Power Project3 MW46.7 km
North Fork Ridge Wind Energy Center149 MW53.2 km
Stockton Hydro52 MW53.5 km