← Back to map

Coyote Ridge Community Solar

Larimer County, Colorado · EIA plant ID 61425 · Operator: poudre valley r e a, inc
SolarSolar PhotovoltaicBA: WACM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202623.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20170.514.3%—
2018323.2%—
20192.922.3%—
20203.224.5%—
20213.224.4%—
20223.123.5%—
20233.123.5%—
20243.224.2%—
2025323.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
COYCSSolar PhotovoltaicPV1.51.5Oct 2017Operating—coming soon

Owner / operator

Operator: poudre valley r e a, inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
poudre valley r e a, inc100.0%2 MW

Nearby plants

Within 80 km.
RV CSU Power LLC2 MW10.1 km
RV CSU Power II LLC3 MW10.3 km
Big Thompson5 MW11.8 km
CBEP Solar 32 MW15.2 km
Flatiron95 MW17.5 km
Carter Hydro3 MW20.7 km