← Back to map

Flatiron

Larimer County, Colorado · EIA plant ID 518 · Operator: U S Bureau of Reclamation
HydroConventional HydroelectricHydroelectric Pumped StorageBA: WACM
Nameplate95MWSummer 95 MW
Generators3in service
Net generation207GWh12 mo to Aug 2026
Capacity factor33%hydro units, summer MW
Heat rate—thermal plants only
First online1954

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-100102030GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202532.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001148.524.9%—
2002160.522.2%—
2003185.224.6%—
2004169.122.4%—
2005183.117.6%—
2006238.331.6%—
2007246.832.8%—
200817022.5%—
200921328.2%—
2010170.722.6%—
2011238.730.4%—
2012221.527.8%—
2013179.922.7%—
2014222.631.3%—
2015143.621.5%—
2016208.132.1%—
2017156.425.1%—
201820031.8%—
2019201.631.6%—
2020126.822.3%—
2021215.433.2%—
2022150.124.4%—
2023201.732.2%—
2024169.426.7%—
2025214.834.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY4343Jan 1954Operating—coming soon
2Conventional HydroelectricHY4343Jan 1954Operating—coming soon
3Hydroelectric Pumped StoragePS8.58.5May 1954Operating—coming soon

Owner / operator

Operator: U S Bureau of Reclamation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Bureau of Reclamation100.0%95 MW

Nearby plants

Within 80 km.
Carter Hydro3 MW5.1 km
Big Thompson5 MW6.3 km
Pole Hill38 MW7.5 km
Coyote Ridge Community Solar2 MW17.5 km
SR Mavericks8 MW23 km
Estes45 MW23.2 km