Pole Hill

Larimer County, Colorado · EIA plant ID 519 · Operator: U S Bureau of Reclamation
HydroConventional HydroelectricBA: WACM
Nameplate38MWSummer 38 MW
Generators1in service
Net generation202GWh12 mo to Dec 2025
Capacity factor60%hydro units, summer MW
Heat rate—thermal plants only
First online1954

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1001020GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202560.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001167.450.0%—
2002174.852.2%—
2003153.645.9%—
2004173.251.6%—
2005125.437.5%—
2006207.662.0%—
2007201.560.2%—
2008174.652.0%—
2009173.151.7%—
2010161.748.3%—
2011208.662.3%—
2012197.658.9%—
2013150.645.0%—
201419257.4%—
2015120.235.9%—
2016190.656.8%—
2017146.543.8%—
2018173.251.8%—
2019213.263.7%—
2020131.239.1%—
2021206.461.7%—
2022147.544.1%—
2023186.455.7%—
2024150.644.9%—
2025202.460.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY38.238.2Jan 1954Operating—coming soon

Owner / operator

Operator: U S Bureau of Reclamation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Bureau of Reclamation100.0%38 MW

Nearby plants

Within 80 km.
Flatiron95 MW7.5 km
Big Thompson5 MW10.6 km
Carter Hydro3 MW10.8 km
Estes45 MW15.7 km
Marys Lake8 MW17.9 km
Coyote Ridge Community Solar2 MW22.3 km