← Back to map

Marys Lake

Larimer County, Colorado · EIA plant ID 517 · Operator: U S Bureau of Reclamation
HydroConventional HydroelectricBA: WACM
Nameplate8MWSummer 9 MW
Generators1in service
Net generation36GWh12 mo to Dec 2025
Capacity factor45%hydro units, summer MW
Heat rate—thermal plants only
First online1951

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20246GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202544.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200143.653.6%—
200239.448.3%—
200316.720.5%—
200430.737.6%—
200516.320.0%—
200638.246.9%—
200747.157.8%—
200848.259.0%—
200941.350.7%—
201034.141.8%—
20114454.0%—
20125061.2%—
201327.834.1%—
201435.243.2%—
20151923.3%—
201636.845.0%—
201731.138.2%—
20184454.1%—
201946.356.8%—
202033.941.5%—
202142.151.7%—
202222.727.9%—
202300.0%—
20244.55.6%—
202536.544.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY8.19.3May 1951Operating—coming soon

Owner / operator

Operator: U S Bureau of Reclamation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
U S Bureau of Reclamation100.0%8 MW

Nearby plants

Within 80 km.
Estes45 MW4.2 km
Pole Hill38 MW17.9 km
Flatiron95 MW25.4 km
Big Thompson5 MW27.7 km
Carter Hydro3 MW27.7 km
Granby Hydro1 MW35.9 km