RV CSU Power II LLC

Larimer County, Colorado · EIA plant ID 57507 · Operator: RV CSU Power II LLC
SolarSolar PhotovoltaicBA: PSCO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20102012201420162018202020222024202611.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20100.13.1%—
20114.918.6%—
20125.119.3%—
20134.617.4%—
20143.613.8%—
20154.416.8%—
20165.119.3%—
20174.718.0%—
20184.416.8%—
20194.617.4%—
20203.914.9%—
20213.814.6%—
20223.111.8%—
20232.710.4%—
20242.710.4%—
2025311.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CSUIISolar PhotovoltaicPV33Dec 2010Operating—coming soon

Owner / operator

Operator: RV CSU Power II LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RV CSU Power II LLC100.0%3 MW

Nearby plants

Within 80 km.
RV CSU Power LLC2 MW0.2 km
Coyote Ridge Community Solar2 MW10.3 km
CBEP Solar 32 MW12.8 km
Pivot Solar 42 LLC—17.7 km
Big Thompson5 MW20.2 km
SR Skylark B2 MW21.3 km