OR Solar 2, LLC

Jackson County, Oregon · EIA plant ID 61200 · Operator: OR Solar 2, LLC
SolarSolar PhotovoltaicBA: PACW
Nameplate10MWSummer 10 MW
Generators1in service
Net generation21GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-10123GWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202623.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20201.88.1%—
202119.622.4%—
202222.325.4%—
202321.324.4%—
202412.714.5%—
202520.723.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ORSR2Solar PhotovoltaicPV1010Oct 2020Operating—coming soon

Owner / operator

Operator: OR Solar 2, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
OR Solar 2, LLC100.0%10 MW

Nearby plants

Within 80 km.
Eagle Point3 MW3.6 km
Antelope Creek2 MW9.3 km
Biomass One LP40 MW13.1 km
Eagle Point Solar10 MW16.2 km
Lost Creek49 MW16.7 km
Dry Creek LFG to Energy Projectretired17.6 km