Eagle Point
Jackson County, Oregon · EIA plant ID 3024 · Operator: PacifiCorp
Nameplate3MWSummer 3 MW
Generators1in service
Net generation15GWh12 mo to Dec 2025
Capacity factor60%hydro units, summer MW
Heat rate—thermal plants only
First online1957
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 15.9 | 60.5% | — |
| 2002 | 17.1 | 64.9% | — |
| 2003 | 15.3 | 58.1% | — |
| 2004 | 16.9 | 64.0% | — |
| 2005 | 16.3 | 62.2% | — |
| 2006 | 13.4 | 50.9% | — |
| 2007 | 18.5 | 75.5% | — |
| 2008 | 17.4 | 70.5% | — |
| 2009 | 17.4 | 70.8% | — |
| 2010 | 17.2 | 70.2% | — |
| 2011 | 18.5 | 75.5% | — |
| 2012 | 17.9 | 72.8% | — |
| 2013 | 16.3 | 66.6% | — |
| 2014 | 16.2 | 66.0% | — |
| 2015 | 16.9 | 68.7% | — |
| 2016 | 18.5 | 75.3% | — |
| 2017 | 18.4 | 74.9% | — |
| 2018 | 16.4 | 66.9% | — |
| 2019 | 16.8 | 68.5% | — |
| 2020 | 16 | 65.0% | — |
| 2021 | 13.4 | 54.7% | — |
| 2022 | 13.6 | 55.4% | — |
| 2023 | 14.7 | 59.8% | — |
| 2024 | 14.6 | 59.4% | — |
| 2025 | 14.8 | 60.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 2.8 | 2.8 | Nov 1957 | Operating | — | coming soon |
Owner / operator
Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| PacifiCorp | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| OR Solar 2, LLC | 10 MW | 3.6 km |
| Antelope Creek | 2 MW | 8.1 km |
| Biomass One LP | 40 MW | 11.6 km |
| Eagle Point Solar | 10 MW | 14 km |
| Dry Creek LFG to Energy Project | retired | 14.5 km |
| Lost Creek | 49 MW | 18.7 km |