Eagle Point

Jackson County, Oregon · EIA plant ID 3024 · Operator: PacifiCorp
HydroConventional HydroelectricBA: PACW
Nameplate3MWSummer 3 MW
Generators1in service
Net generation15GWh12 mo to Dec 2025
Capacity factor60%hydro units, summer MW
Heat rate—thermal plants only
First online1957

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.511.52GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202560.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200115.960.5%—
200217.164.9%—
200315.358.1%—
200416.964.0%—
200516.362.2%—
200613.450.9%—
200718.575.5%—
200817.470.5%—
200917.470.8%—
201017.270.2%—
201118.575.5%—
201217.972.8%—
201316.366.6%—
201416.266.0%—
201516.968.7%—
201618.575.3%—
201718.474.9%—
201816.466.9%—
201916.868.5%—
20201665.0%—
202113.454.7%—
202213.655.4%—
202314.759.8%—
202414.659.4%—
202514.860.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY2.82.8Nov 1957Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%3 MW

Nearby plants

Within 80 km.
OR Solar 2, LLC10 MW3.6 km
Antelope Creek2 MW8.1 km
Biomass One LP40 MW11.6 km
Eagle Point Solar10 MW14 km
Dry Creek LFG to Energy Projectretired14.5 km
Lost Creek49 MW18.7 km