Biomass One LP
Jackson County, Oregon · EIA plant ID 10869 · Operator: Biomass One LP
Nameplate40MWSummer 37 MW
Generators3in service
Net generation199GWh12 mo to Dec 2025
Capacity factor62%other units, summer MW
Heat rate—thermal plants only
First online1985
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 190.4 | 96.6% | — |
| 2002 | 101.2 | 51.4% | — |
| 2003 | 160.2 | 81.3% | — |
| 2004 | 0 | 0.0% | — |
| 2005 | 177 | 89.8% | — |
| 2006 | 157.6 | 79.9% | — |
| 2007 | 140.9 | 71.5% | — |
| 2008 | 127 | 64.3% | — |
| 2009 | 127 | 39.7% | — |
| 2010 | 151.9 | 47.5% | — |
| 2011 | 117.5 | 36.8% | — |
| 2012 | 127.7 | 39.8% | — |
| 2013 | 172 | 53.8% | — |
| 2014 | 195.2 | 61.0% | — |
| 2015 | 152.6 | 47.7% | — |
| 2016 | 155.4 | 48.5% | — |
| 2017 | 117 | 36.6% | — |
| 2018 | 166 | 51.9% | — |
| 2019 | 162.7 | 50.9% | — |
| 2020 | 166.6 | 52.0% | — |
| 2021 | 193.3 | 60.5% | — |
| 2022 | 193.6 | 60.5% | — |
| 2023 | 136 | 42.5% | — |
| 2024 | 213.7 | 66.6% | — |
| 2025 | 199.2 | 62.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BBC | Wood/Wood Waste Biomass | ST | 10 | 8.5 | Dec 1985 | Operating (Standby / backup) | — | coming soon |
| GE | Wood/Wood Waste Biomass | ST | 15 | 14 | Dec 1985 | Operating | — | coming soon |
| GE-2 | Wood/Wood Waste Biomass | ST | 15 | 14 | Jan 2009 | Operating | — | coming soon |
Owner / operator
Operator: Biomass One LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Biomass One LP | 100.0% | 40 MW |
Nearby plants
Within 80 km.
| Antelope Creek | 2 MW | 3.8 km |
| Eagle Point Solar | 10 MW | 4.3 km |
| Dry Creek LFG to Energy Project | retired | 8.6 km |
| Medford Operation | 9 MW | 10 km |
| Eagle Point | 3 MW | 11.6 km |
| OR Solar 2, LLC | 10 MW | 13.1 km |