Quichapa 3

Iron County, Utah · EIA plant ID 61121 · Operator: Quichapa 3 LLC
SolarSolar PhotovoltaicBA: PACE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%200%400%20162018202020222024202627.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20168.6383.2%—
20177.930.2%—
2018830.3%—
20197.829.8%—
2020830.5%—
20217.829.5%—
20227.327.9%—
20237.528.5%—
2024726.8%—
20257.227.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
W5521Solar PhotovoltaicPV33Dec 2016Operating—coming soon

Owner / operator

Operator: Quichapa 3 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Quichapa 3 LLC100.0%3 MW

Nearby plants

Within 80 km.
Quichapa 13 MW2 km
Quichapa 23 MW4.6 km
Fiddler's Canyon 33 MW9.2 km
Iron Springs Solar, LLC80 MW10.9 km
Fiddler's Canyon #13 MW11.3 km
Iron Springs BESS80 MW11.7 km