← Back to map

Quichapa 1

Iron County, Utah · EIA plant ID 61119 · Operator: Quichapa 1 LLC
SolarSolar PhotovoltaicBA: PACE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%200%400%20162018202020222024202628.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20168.6383.2%—
20178.231.2%—
20188.130.6%—
2019830.4%—
20208.130.6%—
20217.930.1%—
20227.829.8%—
20237.629.1%—
20246.625.1%—
20257.428.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
W5519Solar PhotovoltaicPV33Dec 2016Operating—coming soon

Owner / operator

Operator: Quichapa 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Quichapa 1 LLC100.0%3 MW

Nearby plants

Within 80 km.
Quichapa 33 MW2 km
Quichapa 23 MW2.6 km
Fiddler's Canyon 33 MW8.1 km
Iron Springs Solar, LLC80 MW9 km
Iron Springs BESS80 MW9.8 km
Fiddler's Canyon #13 MW10.7 km