← Back to map

Iron Springs Solar, LLC

Iron County, Utah · EIA plant ID 59941 · Operator: clearway renewable operation & maintenance llc
SolarSolar PhotovoltaicBA: PACE
Nameplate80MWSummer 80 MW
Generators1in service
Net generation212GWh12 mo to Aug 2026
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202630.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2016114.539.0%—
201721230.3%—
2018211.830.2%—
2019208.229.7%—
2020219.831.3%—
202120629.4%—
2022207.329.6%—
202320429.1%—
2024212.830.3%—
2025213.630.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ISSSolar PhotovoltaicPV8080Aug 2016Operating—coming soon

Owner / operator

Operator: clearway renewable operation & maintenance llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Clearway Energy, Inc100.0%80 MW

Nearby plants

Within 80 km.
Iron Springs BESS80 MW0.9 km
Fiddler's Canyon 33 MW5.8 km
Quichapa 23 MW6.9 km
Granite Mountain Solar East, LLC80 MW8.9 km
Quichapa 13 MW9 km
Fiddler's Canyon #13 MW9.5 km