Foundation CDCR LAC
Los Angeles County, California · EIA plant ID 61066 · Operator: Foundation CA Fund VIII Manager, LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor26%wind units, summer MW
Heat rate—thermal plants only
First online2017
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 0 | 0.0% | — |
| 2018 | 4.3 | 25.6% | — |
| 2019 | 4.5 | 27.2% | — |
| 2020 | 4.3 | 25.9% | — |
| 2021 | 5 | 30.2% | — |
| 2022 | 4.6 | 27.9% | — |
| 2023 | 4.2 | 25.3% | — |
| 2024 | 4.7 | 28.0% | — |
| 2025 | 4.3 | 26.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WTG1 | Onshore Wind Turbine | WT | 1.9 | 1.9 | Dec 2017 | Operating | — | ge 1.85-82.5 |
Owner / operator
Operator: Foundation CA Fund VIII Manager, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Foundation CA Fund VIII Manager, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| CSP Los Angeles | 2 MW | 0.7 km |
| Antelope Expansion 1B | 17 MW | 4.5 km |
| Horn | 2 MW | 5.3 km |
| Lancaster Solar 2 | 2 MW | 5.5 km |
| Portal Ridge Solar C, LLC | 11 MW | 5.5 km |
| Antelope Big Sky Ranch | 20 MW | 6.1 km |