← Back to map

Antelope Expansion 1B

Los Angeles County, California · EIA plant ID 62320 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate17MWSummer 17 MW
Generators1in service
Net generation47GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2022202320242025202631.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20222.49.8%—
202346.931.5%—
202445.430.4%—
202546.631.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ANE1BSolar PhotovoltaicPV1717Nov 2022Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%17 MW

Nearby plants

Within 80 km.
Portal Ridge Solar C, LLC11 MW1.4 km
Horn2 MW1.6 km
Portal Ridge Solar B, LLC20 MW2.1 km
San Pablo Raceway100 MW2.1 km
Lancaster Dry Farm Ranch B5 MW2.8 km
Rodeo Solar D22 MW2.8 km