← Back to map

Lancaster Solar 2

Los Angeles County, California · EIA plant ID 59169 · Operator: Boralex US Operations LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202616.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20140.14.8%—
20153.627.8%—
20163.627.2%—
20173.425.8%—
20183.627.4%—
20193.425.5%—
20203.425.6%—
20213.325.2%—
20223.425.6%—
20232.619.9%—
20242.619.8%—
20252.116.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LS2Solar PhotovoltaicPV1.51.5Nov 2014Operating—coming soon

Owner / operator

Operator: Boralex US Operations LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Boralex Lancaster California LLC100.0%2 MW

Nearby plants

Within 80 km.
Division 21 MW3.3 km
Division 12 MW3.3 km
Division 31 MW3.3 km
SEPV Sierra11 MW3.5 km
Kettering Solar 21 MW4 km
Kettering Solar 11 MW4 km